A construction framework is a panel of contractors a public buyer picks once, through one tender, and then hands jobs to for years without advertising each one again. A DPS (dynamic purchasing system) is the open version: a list of approved suppliers you can apply to join at any time. Under the Procurement Act 2023 the DPS has become the dynamic market.
That is the whole idea. The jargon around it - lots, call-offs, mini-competitions, open frameworks, conditions of membership - is what keeps small firms out, because most of them read "framework" on a council website, assume it is closed to them, and move on. Some of it is closed. A surprising amount is not.
I run a subcontracting model: win the work, sub the delivery, keep the spread. Public frameworks are where a lot of the steady repairs, voids and minor works money sits, and in our directory of 557 UK work-winning gates, 82 entries mention a framework and at least 33 name a DPS or dynamic market. This post is the plain-English map of how those doors actually work and which ones a small contractor can push today.
The four ways public work is bought
Before frameworks make sense, you need the alternatives. A public buyer that needs building work has four basic routes:
| Route | Who can get in | When you can join | What it suits |
|---|---|---|---|
| Open tender (one contract) | Anyone who bids | Only while that tender is live | One-off jobs and projects |
| Approved or quote list | Firms on the buyer's roster | Usually any time | Small works below the advertising line |
| Framework | The firms appointed when it was tendered | At tender, or at a scheduled re-opening | Years of repeat work across many sites |
| DPS or dynamic market | Any firm that meets the conditions | Any time in its life | Repeat work where the buyer wants a wide, refreshable pool |
The approved list is covered in depth in how to get on a council approved contractor list. This post is about the bottom two rows, because that is where most of the volume runs.
How a framework actually works
A framework is not a contract for work. It is an agreement about how future contracts will be awarded. You can win a place and never get a job from it, which is the first thing nobody tells you.
The mechanics:
- The buyer tenders the framework once. It sets out the scope, the terms, how jobs will be handed out and, usually, a set of lots.
- Lots split the work. A typical construction framework divides by value band (minor works, medium works, major works), by trade (roofing, electrical, fire safety) or by region. This is the single most important detail for a small firm, because the minor works lot in your region is a much smaller competition than the framework headline suggests.
- Suppliers are appointed. Once the framework is awarded, the list is fixed. If you missed it, you are out until it is tendered again or re-opens.
- Jobs are "called off". When a member needs work done, it awards a call-off contract to one of the framework suppliers.
Under the Act, a call-off can be awarded with or without competition between the framework suppliers. With competition, the buyer runs a short contest between the suppliers on that lot - what most people in the industry still call a mini-competition. Without competition, the framework itself has to set out an objective way of choosing the supplier, such as a ranking or a rotation. Read that part of any framework you bid for. It tells you whether a place means work or just a seat.
How long they last. The maximum term for most frameworks under the Procurement Act 2023 is four years. Defence and utilities frameworks can run for eight. A buyer can go longer only if it decides the call-off contracts genuinely need it. Call-off contracts themselves can run past the end of the framework, which is why a contract awarded in its last month can feed a firm for years.
Who runs them. Many construction frameworks are not run by a single council at all. They are run by buying consortia and procurement bodies that let dozens or hundreds of public organisations use one framework. In our directory these include Fusion21, Efficiency East Midlands, Procure Partnerships, Pagabo, Scape, YORhub's YORbuild3 minor, medium and major works frameworks, Constructing West Midlands, the Southern Construction Framework and Crown Commercial Service's construction works agreement. One place can open doors to many buyers, which is why these competitions are worth the paperwork.
Open frameworks: the closed door with a timetable
The Procurement Act 2023 added something useful for anyone who missed the last tender: the open framework.
An open framework is a scheme of frameworks on the same terms that must be re-opened to new suppliers at least once in its first three years, and then at least every five years after that, up to an eight-year total. At each re-opening, new firms can bid to join and existing members can be re-assessed.
What that means in practice: a framework is no longer always a four-year wait. If the notice says "open framework", the re-opening date is a date for your diary. Sutton Housing Partnership in south London, for example, tendered its void property works and general building maintenance framework and a support trades supply chain framework as open frameworks in 2025 - exactly the kind of trade lots a small repairs firm fits.
DPS and dynamic markets: the door that stays open
A DPS works the other way round. Instead of picking a fixed panel once, the buyer publishes the conditions a supplier must meet and keeps the list open for its whole life. Meet the conditions, apply, get admitted. When a job comes up, the buyer runs a competition among the members.
For a small contractor that is the most useful door in public procurement, for three reasons:
- No deadline to miss. You apply when you are ready, not when a tender happens to be live.
- No cap on numbers. Under the Act, the number of suppliers on a dynamic market cannot be limited. You are not competing for one of six places.
- Proportionate entry. The conditions of membership have to be proportionate to the contracts being awarded, and a buyer cannot make "you must have worked for us before" a condition.
What changed in 2025. The Procurement Act 2023 came into force on 24 February 2025 and replaced the DPS with the dynamic market for new procurements. A dynamic market does the same job: it must stay open to new suppliers at any time, applications have to be considered within a reasonable period, and contracts are awarded through a competition limited to members. Note one limit: dynamic markets are for contracts above the procurement thresholds, so smaller jobs still run through approved lists and quotes.
What happens to the old ones. A DPS set up under the old 2015 rules carries on under those rules, but it has to end when it was planned to, or by 23 February 2029 at the latest, whichever comes first. Every one of those endings is a rebuild: the buyer either lets the work lapse or sets up a replacement, and a replacement is a fresh chance to get in on equal terms with the incumbents.
Named examples from the directory. These are all public bodies or public-sector consortia, and all open to qualifying firms:
- NHS North of England Commercial Procurement Collaborative - Minor Works Trades and Associated Services DPS. NHS estates minor works across 42 geographic areas, in 21 trade categories from roofing and joinery to plastering, flooring and asbestos.
- NHS London Procurement Partnership - Minor Works and Maintenance DPS. Reactive and planned estates work for London NHS trusts.
- NHS Commercial Solutions (South East) - Works and Maintenance DPS. 28 or more categories across Surrey, Sussex, Kent and the wider south east, and you choose your own geographic reach.
- Community Health Partnerships DPS. Repairs, maintenance and works across 300-plus NHS LIFT health centres.
- South West Procurement Alliance. Always-open systems for repair and maintenance, energy efficiency and whole-house refurbishment, free to register.
- Procurement Hub (Places for People). A suite of property works, construction works and fire safety DPS routes that stay open year-round.
All four NHS routes use the same Atamis supplier system, so one registration does a lot of the work. Check each route's own page for its current status - systems are being renewed and replaced through to 2029, and the replacement is often where the door reopens.
Fees: what you can and cannot be charged
Framework fees confuse people because the private sector charges for everything. The public rules are stricter than most firms expect.
Under the Act's guidance, a buyer cannot charge you to get onto a framework. It can charge a fee only to a supplier that wins a call-off contract, the fee has to be a fixed percentage of that contract's estimated value, and it has to be published up front and cannot change during the framework's life. The same structure applies to dynamic markets outside the utilities sector.
So if someone asks for money to put you on a public framework, that is not the framework. It may be a consultant, an accreditation the buyer requires, or a paid alert service - all separate decisions. Accreditation is usually the real cost: many frameworks and DPS routes ask for an SSIP-member health and safety scheme or similar before award, which I break down in the plain-English procurement glossary.
How a small contractor actually gets in
Here is the order I would work in.
1. Register on the central digital platform first. You need a supplier record and PPON for public work under the Act anyway, it is free, and it is where framework and dynamic market notices are published. If the notice types are new to you, what the Find a Tender service is explains the chain, including the dynamic market notices.
2. Join every open DPS and dynamic market that fits your trade and patch. These are the doors that do not have a deadline. Start with the ones above if you do estates or maintenance work, then search Find a Tender for dynamic market notices in your trade.
3. Put framework re-tenders and open-framework re-openings in a calendar. Every framework notice states its term. Work back from the end date, watch for the pipeline and preliminary market engagement notices, and be ready with your evidence before the tender lands, not after. Setting up alerts on Find a Tender and Contracts Finder is how you catch them.
4. Bid the lot, not the headline. A 500-million-pound framework headline can hide a minor works lot for your region that a five-van firm can genuinely win. Read the lot structure before deciding it is too big.
5. Subcontract to the firms that already hold places. This is the route most small firms overlook, and it is the one my model is built on. Every framework holder needs a supply chain, and the award notice tells you exactly who just won and when they will need trades. The Act also requires buyers to consider the particular barriers small firms face when they design a procurement, which is one reason supply chain commitments keep appearing in framework terms.
6. Use the buyer's own portal for everything below the line. Approved lists and quote rosters still carry the small work that frameworks and dynamic markets do not touch - see how to register on council procurement portals.
Housing associations, Wales and Scotland
Housing associations buy through all of the above, often via consortia that run frameworks and dynamic markets for many landlords at once. The Plan@Job team (the same team behind this site) wrote a practical guide to getting work with housing associations that covers the landlord side in detail.
Wales sits under the Procurement Act 2023 but has its own portal and consortia, covered in finding public and housing association work in Wales. Scotland is different: it opted out of the Act and runs its own rules, so frameworks and DPS there follow Scottish law - mapped in council and housing association work in Scotland.
FM and cleaning buyers use the same machinery. A join-any-time route like the Crown Commercial Service FM and workplace services DPS is one of the doors in the sourcing guide to commercial cleaning contracts, which applies this map to cleaning firms.
The short version
A framework is a closed panel you get onto at tender time or at a scheduled re-opening. A DPS, now a dynamic market, is an open list you can join whenever you meet the bar. For a small contractor the open lists are the door to push today, the framework calendar is the door to plan for, and subcontracting to framework holders is the door that pays while you wait.
If you want the wider map of where all 557 gates sit, start with where to find construction contracts in the UK. And if you are wondering why a business that subcontracts the delivery would chase public work at all, read what construction arbitrage is.
Procurement rules and individual systems change. Everything here was checked against Cabinet Office guidance on 18 November 2026; if a buyer's notice says something different, the notice wins.
Frequently asked questions
What is a construction framework?+
A construction framework is an agreement a public buyer or buying consortium sets up with a fixed group of contractors, chosen through one tender, so that individual jobs can be awarded to them later without a fresh full tender each time. Under the Procurement Act 2023 most frameworks run for up to four years, and you can only get on one when it is tendered or, for an open framework, when it re-opens.
What is a DPS in procurement?+
A DPS, or dynamic purchasing system, is a list of pre-qualified suppliers that stays open for new suppliers to join at any time, rather than closing after one tender. The Procurement Act 2023 replaced it with the dynamic market for new procurements from 24 February 2025. Dynamic purchasing systems set up under the old 2015 rules can keep running, but must end by 23 February 2029 at the latest.
What is the difference between a framework and a DPS?+
A framework is closed: the supplier list is fixed when it is awarded and you wait for the next tender or a scheduled re-opening to join. A DPS, and its replacement the dynamic market, stays open: if you meet the published conditions you can apply at any point in its life, and there is no cap on how many suppliers get in.
Can a small contractor get on a framework?+
Yes, mainly in three ways: bid for a lot sized and located for smaller firms (many regional frameworks split minor works from major works), join an open framework when it re-opens, or work as a subcontractor to a firm that already holds a place. Buyers must also consider the barriers small firms face when they design a procurement under the Act.
Do you have to pay to join a framework?+
Not under the Procurement Act 2023. Guidance says it is not permissible to charge suppliers to get onto a framework. A buyer can charge a fee only to a supplier that wins a call-off contract, and only as a fixed percentage of that contract's estimated value, published up front. The same rule applies to dynamic markets outside the utilities sector.
Mohamed El HadriCo-Founder
I'm a co-founder of several construction companies. I built a construction business from a 30-van operation into a lean model with 1,500+ subcontractors in the database - winning the work as the main contractor, subbing it out, and running it as a system from a laptop across multiple countries. I write this site from what actually works.
@mointhemarket · 35.1k followers on Instagram →Run the model with people who already do
Reading the method is step one. Inside Construction Arbitrage Players you connect with players from around the world who run construction arbitrage every day and make real money from it - share your deals, get answers, and get in the game. Founding-member access is open now.
For the operator life and the inside story, see Contractor Club.
THE EDGE - the listening book on how the money really moves through a contracting business - is out now. Listen free, or see what is inside.
The Family Secret - how construction arbitrage really works - is coming soon.
A construction business built this way is a sellable asset
Systems, subs and margin - that is exactly what buyers pay for. If you own a construction or trade business and the exit is on your mind, list it on ContractorExit, the marketplace for buying and selling trade businesses. The valuation is free, so you find out what it is worth before you decide anything.
Get the Construction Arbitrage playbook
One sharp email a week: real numbers, live deal breakdowns, and the systems that let you run jobs you never visit. No fluff, unsubscribe anytime.



